This project was designed to create a new T-Mobile cell site that included all of T-Mobile’s latest cell technologies and required replacement of a 135-foot LIPA transmission tower SP#2085, which supports two 138kV transmission circuits on it. All of the tower work and the high cell site work had to be coordinated, performed and tested during LIPA/PSEG transmission circuit clearances. Ground work included construction of an 11′ x 30′ enclosure housing the cell site compound equipment inside.