We were tasked with alleviating the overload on the overhead and underground distribution system on Line 388 in Manchester NH. This was accomplished by installing new 50-foot poles and building a 35-section express spacer cable feeder through double circuit poles in a congested city environment. Our underground crews installed 500 mcm of solid dielectric cables through fifteen manholes and made 35kV splices and terminations.