We rebuilt approximately two miles of transmission line, while the existing 35kV line remained energized. Haugland crews installed a 21 new structures, single pole, H-Frame and 3-pole dead ends. A new feeder was built around the existing substation, and the wire on the right-of-way was transferred, using the 35kV gloving method. New conductors were installed on a 1000-foot span river crossing, which included coordinating boat traffic State authorities.