Haugland Energy installed of 34 poles of various lengths for the relocation of 33kV and 69kV circuits. Due to six feet of flooding at the Substation caused by Superstorm Sandy, the switchgear needed to be bypassed. In addition to the poles, work included the stringing of new lines, four disconnect switches, and breakers.