This multi-million project included cracking and sealing the existing concrete pavement, while providing a seven-inch asphalt overlay on a five-mile stretch of roadway. An under drain was installed on all four shoulders, and the Intelligent Transportation System (ITS system) for the State of New York was extended.

Grace Industries performed a bridge deck overlay, which required a 30-day bridge closure, and various maintenance and repairs on three bridges. Our commitment to value engineering led us to present a proposal that would minimize the use of a temporary concrete barrier by installing a permanent guide rail, reducing the need for temporary construction and changing the work method, which provided significant savings on the project.