We were tasked with alleviating the overload on the overhead and underground distribution system on Line 388 in Manchester NH. This was accomplished by installing new 50-foot poles and building a 35-section express spacer cable feeder through double circuit poles in a congested city environment. Our underground crews installed 500 mcm of solid dielectric cables through fifteen manholes and made 35kV splices and terminations.

Portrait of PSNH Line 388 Overload Solution

Thomas Halpin

Vice President

Portrait of PSNH Line 388 Overload Solution

William Leonard

Director of Safety

Mark Grimes

Project Manager

Steve O'Halloran

Superintendent

PSNH Line 388 Overload Solution

PROJECT COMPLETED

4

MONTHS