LIRR Ronkonkoma Line Second Track

LIRR Ronkonkoma Line Second Track

Metropolitan Transportation Authority (MTA)

Haugland Energy is currently serving as a subcontractor for L.K. Comstock & Company Inc. on their contract with the Metropolitan Transportation Authority (MTA) to add a second track on the Long Island Rail Road (LIRR) Main Line Ronkonkoma Branch between Farmingdale and Ronkonkoma, NY. This project is part of New York Governor Andrew Cuomo’s $6.6 billion transformation and modernization of commuter rails initiative on Long Island.

Project Details

U.S. Virgin Islands Storm Restoration

U.S. Virgin Islands Storm Restoration

Virgin Islands Water and Power Authority (WAPA)

The Virgin Islands Water and Power Authority contracted Haugland Energy to provide emergency line crews and equipment for the restoration of electrical transmission and distribution systems after Hurricanes Irma and Maria devastated the area in late summer/early fall 2017.

Project Details

FEMA Long Island Electric Distribution Storm Hardening

FEMA Long Island Electric Distribution Storm Hardening

PSEG Long Island

This $200+ million, three-year reliability and resiliency project will further strengthen the electric grid across Long Island and in the Rockaways. Following Superstorm Sandy, LIPA and National Grid (the previous service provider to LIPA) acquired funds under the FEMA 406 Mitigation program to implement a Hazard Mitigation Program to the LIPA transmission and distribution system. The primary focus of the program is to harden Long Isl​and's Transmission and Distribution system by upgrading approximately 450 miles of mainline distribution lines. This is an effort to increase resilience to future storm damage, and reduce the number of customers impacted by service interruptions by 20% when storm damage occurs.

Project Details


13.8kV Distribution Feeder Installation

Wakefield Municipal Light and Gas

This project for WMGL required the installation of 15kV Hendrix spacer cable, along with new secondary cable, the transfer/replacement of existing equipment, and the replacement of 60 guyed and un-guyed wooden poles. During the phased demolition, the existing circuit needed to remain energized, and customer outages were prohibited.

Project Details

PSNH Power Street URD Replacement

Eversource

Installation of approximately 2,200 feet of 3ph underground cable, and removal of existing overhead pole line. This project includes the excavation and installation of 2,200 feet of conduit, and the splicing and terminating of the 35kV medium voltage cable. Haugland Energy overhead crews also installed riser poles and overhead lateral feeds to the existing circuits.

Project Details