MTA NYCT System Wide Water Mitigation

MTA NYCT System Wide Water Mitigation

Metropolitan Transportation Authority (MTA) New York City Transit (NYCT)

Grace Industries was contracted by the Metropolitan Transportation Authority (MTA) New York City Transit (NYCT) to perform work to clear and clean its subway track drainage infrastructure at several locations.

Project Details

Westchester Creek Wetland Mitigation

Westchester Creek Wetland Mitigation

Port Authority of New York and New Jersey

Grace Industries was awarded a contract with the Port Authority of New York and New Jersey to remove historic fill along the shoreline of Westchester Creek in the East Bronx, NY, and place new riprap to create a high and low marsh area for wetland plantings. The scope includes work to mill and pave an existing playground at the Bronx YMCA, at the access point to the shoreline. Grass areas will be restored, and wetland plantings will be placed along the shoreline in the spring of 2018.

Project Details

Rockaway Boardwalk Reconstruction

Rockaway Boardwalk Reconstruction

Rockaway, New York

To date, Grace Industries has been awarded 19 contracts at the Rockaway Boardwalk project, spread out over five phases. The 4.7-mile project includes the installation of more durable structures and dunes at beaches, boardwalks, and adjacent DPR property lines; bolstering efforts to prevent future damage from storms like Superstorm Sandy.

Project Details


RT 110 Interchange Reconstruction and Widening

RT 110 Interchange Reconstruction and Widening

New York State Department of Transportation

This $55+ million reconstruction and widening project encompassed signal, drainage, safety and capacity improvements to the Northern State Parkway Bridge over Route 110 in Melville, NY. This project is the second phase of a series of three projects which, upon completion, will widen Route 110 through a critical, heavily traveled corridor between the Long Island Expressway and the Northern State Parkway. In an effort to reduce project cost for our clients, we evaluated the possibility of condensing this three phase project into two phases to reduce the overall contract duration, resulting in financial savings.

Project Details

Long Beach Boardwalk Reconstruction

Long Beach Boardwalk Reconstruction

City of Long Beach

The scope of this $44 million project called for the reconstruction of the iconic Long Beach Boardwalk. The 2.2 mile long boardwalk was destroyed by Superstorm Sandy. This 200-day fast tracked project is on time and on budget.

Project Details

C.R. 67 Motor Parkway Bridge

C.R. 67 Motor Parkway Bridge

Suffolk County

This project called for the reconstruction of CR-67 bridge over the Long Island Expressway. Approaching the project with efficiency and innovation in mind, we consolidated this three-stage project into two stages by eliminating a sidewalk and securing a taxi service for pedestrians. We also capitalized on a changed condition from the Owner allowing us to advance our project through the winter, in turn minimizing project cost.

Project Details

Replacement of Shore Road Circle Bridge Over Amtrak

Replacement of Shore Road Circle Bridge Over Amtrak

New York City Department of Transportation

This multi-million dollar project called for the replacement of the Shore Road Circle Bridge over Amtrak, including the deck, abutments, joint materials, structural concrete, rebar, bearings, curtain walls, and all associated items required for a complete replacement. We also performed landscaping, fencing, demolition of existing abandoned substructures, and removal and proper disposal of hazardous materials.

Project Details

Bronx River Greenway, Rehabilitation of Starlight Park

Bronx River Greenway, Rehabilitation of Starlight Park

New York State Department of Transportation

This scope of this multi-disciplined, two-year project, included the installation of a new pedestrian bridge, grading, demolition, pavement, sidewalks, curbs, drainage, lighting, fencing, retaining walls, landscaping, precast bleachers, artificial turf for a soccer/baseball field, basketball court, fountain, playground, and picnic area.

Project Details

Ocean Parkway Viaduct Rehabilitation - Phase II Brighton Line (BMT)

Ocean Parkway Viaduct Rehabilitation - Phase II Brighton Line (BMT)

Metropolitan Transit Authority

The scope of this million dollar project included the repair of six existing columns and abutments through the removal of deteriorated concrete, replacing it with new rebar and concrete. Repairs were made to spandrel beams and transverse girder encasement. We removed, replaced, then restored the deteriorated architectural finish on the viaduct façade and soffit to its original condition.

Project Details

Route 347 Reconstruction

Route 347 Reconstruction

New York State Department of Transportation

This $26.8 million dollar contract to reconstruct and widen Route 347, included new asphalt paving, drainage, signal improvements, safety and capacity improvements. Our innovative approach to the project included the relocation of a proposed water main from the right travel lane to the shoulder, which resulted in a reduction of night closures and lessened the need to work through traffic, accelerating the project schedule and reducing costs.

Project Details

Resurfacing of Route 684

Resurfacing of Route 684

New York State Department of Transportation

This multi-million project included cracking and sealing the existing concrete pavement, while providing a seven-inch asphalt overlay on a five-mile stretch of roadway. An under drain was installed on all four shoulders, and the Intelligent Transportation System (ITS system) for the State of New York was extended.

Project Details

City of Long Beach Comfort Stations

City of Long Beach Comfort Stations

City of Long Beach, NY

Grace Industries constructed five elevated Comfort Stations along the Long Beach Boardwalk, replacing the existing bathrooms which were heavily damaged during Superstorm Sandy. Work included construction of pile supported, cast-in-place concrete foundations. The prefabricated concrete unit bathroom structures were assembled using a crane at each location.

Project Details

NCDPW Bay Park Sewage Treatment Plant Perimeter Flood Protection Berm & Wall

NCDPW Bay Park Sewage Treatment Plant Perimeter Flood Protection Berm & Wall

NCDPW

Grace Industries was contracted to construct a 6,700 linear foot flood wall around the Bay Park Sewage Treatment Plant in East Rockaway, New York to protect against storms like Superstorm Sandy. The wall consists of a subterranean slurry wall extending 25 feet below sea level, as well as a combination of concrete walls and earthen levee berms that reach 17 feet above sea level.

Project Details

Northern State Parkway Repaving

New York State Department of Transportation

This multi-million dollar project called for the repaving of sixteen miles of the Northern State Parkway, stretching from Route 110 to Happauge. We approached this project with value engineering in mind, utilizing two RoadTec 900x on the 25-feet wide roadway, which enabled us to mill both lanes simultaneously. We also utilized Michigan wedge pavement joints to eliminate the need to back up and square up the new paving each night, increasing our productivity, resulting in an expedited project schedule and a reduction in project cost.

Project Details