Haugland Energy performed the inspection, maintenance and testing of the Calpine Kennedy Airport Power Plant. The work included testing all protective relaying for Bus-2/13.8kV, 4.16kV and 480 volt Swbds, including instrument meters, transformers and dry air reactor.

  • Test all protective relaying for Bus-2/13.8kV, 4.16kV and 480 volt Swbds, including all instrument meters
  • Inspect, clean and test all M.V. Swbds for Bus-2/13.8kV and 4.16kV including D.O. PT’s
  • Inspect, clean and test all M.V. circuit breakers for Bus-2/13.8kV and 4.16kV Swbds
  • Inspect, clean and test all M.V. Motor Starters for Bus-2 4.16kV Swbd
  • Inspect, clean and test all L.V. circuit breakers for Bus-2 480V Swbds
  • Inspect, clean and test one GSU oil filled transformer (138kV -13.8kV), including 138kV terminations
  • Inspect, clean and test one aux. oil filled transformer (13.8kV-4.16kV), including fill of LTC to proper level with customer supplied oil
  • Inspect, clean and test one aux. dry transformer (4.16kV – 480V)
  • Inspect, clean and test one captive dry transformer (13.8kV – 4.16kV)
  • Inspect, clean and test one dry air reactor
  • Inspect, clean and test instrument meters on GT #2 control panel
  • Perform on-line PT/CT signal verification prior to outage
  • Perform trip checks on 13.8kV Bus two relays
  • Inspect, clean and test two medium voltage ground and test devices