Construction at a CMP Greenfield substation will support two wind farm developments. Our work on the Greenfield Ludden Lane substation includes construction of approximately 1,000 feet of 115kV transmission lines, tubular steel terminal structures, a substation control enclosure, and installation of various electric transmission system protective devices, including air break switches, SF6 circuit breakers, disconnect switches, motor operators, instrument transformers and related sensing and communication devices. The scope also includes installation of protection and control relay cabinets, AC and DC station services, station batteries, lighting, fencing and other related equipment and materials.