Entergy has a bi-yearly outage at each of the nuclear power units, when electrical testing is conducted and maintenance is performed on switches, breakers, lightening arresters, current and potential transformers. Additionally, cleaning and inspection of insulators, at both the Entergy yard and Buchannan Substation is completed. Our scope of work included the replacement of gaskets, oil seals, and leak repairs on lead wipes on six 138kV XLPE cable terminations.

Brian Kalwicz

Project Manager

Jeff Mador

Project Manager

John Van Hussein

Foreman

Indian Point Termination Repair and Overhead Line Inspection

PROJECT COMPLETED

31

DAYS