Haugland Energy installed of 34 poles of various lengths for the relocation of 33kV and 69kV circuits. Due to six feet of flooding at the Substation caused by Superstorm Sandy, the switchgear needed to be bypassed. In addition to the poles, work included the stringing of new lines, four disconnect switches, and breakers.

Brian Kalwicz

Project Manager

Jeff Mador

Project Manager

George Reinhart

Foreman

Far Rockaway Re-Route of 33 and 69kV Cable Circuits

PROJECT COMPLETED

29

DAYS