Installation of approximately 26,165 feet of two-inch Cable-In-Conduit, utilizing Horizontal Directional Drilling (HDD) technology of four NSTAR service territories located in Cape Cod, MA. Work included all required fiberglass, and/or concrete pull boxes, single-phase switching stations, grounding, bond frames, temporary and permanent restoration. The project was performed at four locations in Cape Cod, Massachusetts in the NSTAR service territory.